As per reports, on the Ahmedabad-Mehsana highway near Sabarmati Metro Station, the breakage in the main drainage line on the main road is causing traffic problems as of Monday (23 September). Although the repair work has started, it will take at least five days until Saturday (28 September) for the repair work to be finished.