As per reports, the Chief Engineer of Kashmir Power Distribution Corporation Limited (KPDCL) has scheduled power supply interruptions at receiving stations connected to the 33kV Badampora-Wangipora tap line from 1000 hours to 1600 hours on Monday (17 February) due to repair work. The affected areas include Batwina, Nowgam, Wangipora, Jazna, Ahan, Waskura, Kharbagh, Guzhama, Sumbal, and Nesbal.
Share on WhatsApp
Intelligence Alert
Power supply disruption scheduled in parts of Jammu on Monday (17 February)
Related
More from India
Mega block scheduled on Central and Harbour lines in Mumbai on Sunday (27 September)
As per Central Railway (CR), maintenance blocks will be undertaken on the Central and Harbour lines on Sunday (27 September) for track,…
Read the alert →CM Sukhvinder Singh Sukhu to visit Balh, Mandi on Saturday (26 September)
As per reports, the Chief Minister (CM) of Himachal Pradesh, Sukhvinder Singh Sukhu, will visit Balh constituency in Mandi on Saturday (26…
Read the alert →3.6 magnitude earthquake reported in Bageshwar, Uttarakhand on Saturday (26 September)
The National Center for Seismology (NCS) has reported that an earthquake of 3.6 magnitude earthquake occurred in Bageshwar, Uttarakhand, around 1235 hours…
Read the alert →