Four-day closure of I-494 at Highway 52 Interchange in Inver Grove Heights scheduled from Thursday (15 May) - datasurfr
banner

LowUnited States2025-05-15T00:00:00Z

As per reports, the Minnesota Department of Transportation (MnDOT) has announced the closure of both directions of I-494 at the Highway 52 interchange in Inver Grove Heights for four days from Thursday (15 May).

• The closure will begin at 2100 hours (local time) on Thursday (15 May), and is expected to last until 0500 hours (local time) on Monday (19 May), weather permitting.
• The affected stretch of I-494 lies between Blaine Avenue and Babcock Trail, including the full section of Highway 52 to I-494.
• The closure is part of a larger infrastructure project involving redecking bridges and paving ramps on Highway 52, which runs over I-494.
• Traffic will be rerouted through designated detours during the closure period; signage will be posted to guide drivers.

WhatsApp
LinkedIn
Facebook
Twitter
Email

Subscribe Our Newsletter

Book a Demo

Please enable JavaScript in your browser to complete this form.
Are you using any Analysis tool or had used before ?
LinkedIn, Friends of Friend, etc.