As per reports, a 200-metre floating pedestrian bridge will link the two sides of Al Mamzar Beach, it was announced on Monday (03 June). This came as the urban planning committee in Dubai issued contracts to develop two popular stretches of beaches: Al Mamzar and Jumeirah 01.
Developments are expected to be completed in 18 months.