As per reports, Dartford Crossing is scheduled for a full closure of the Queen Elizabeth II (QEII) Bridge from 2200 hours local time on Saturday (24 February) until 0500 hours local time on Sunday (25 February).
• The west-bore tunnel will remain open for north-bound traffic, with vehicles less than 4.8 meters high using it as usual.
• For vehicles between 4.8 meters and five meters high, an alternative diversion via the M25 clockwise will be implemented.
• South-bound traffic will be redirected through a contraflow diversion in the east-bore tunnel.
• Nightly closures of the east-bore tunnel will occur from 2200 hours local time to 0500 hours local time on Sundays recurrently, while the west-bore tunnel will not close on Saturday (24 February) due to the full closure of the QEII Bridge.