As per reports, the Provincial Council of Gipuzkoa announced road surface repair works on the GI 3360 road connecting Bergara and Elgeta through the Angiozar area from Wednesday (11 March) to 20 March.
• Authorities stated that the maintenance works are part of a sustainable pavement rehabilitation programme implemented across the provincial road network.
• The works are scheduled to be conducted in two phases, with the first section covering the route between Bergara and the access to the Angiozar neighbourhood.
• The second phase is scheduled to extend from Angiozar to the intersection with the GI 2639 road, which connects the N 636 route at Kanpazar with Eibar through Elgeta.
