Traffic rerouted in Bandra Kurla Complex from 21 January till 20 April - datasurfr Traffic rerouted in Bandra Kurla Complex from 21 January till 20 April - datasurfr
loader
banner

LowIndia2025-01-21T00:00:00Z

As per reports, the Mumbai Traffic Police announced temporary changes to vehicular movement in Bandra Kurla Complex (BKC) due to frequent reports of heavy traffic congestion. These changes will be in effect from Tuesday (21 January) to 20 April. The official order is awaited.

• Avenue 3 Road will be closed to vehicles from the WeWork building gap to the BKC Connector Junction.
• The stretch from BKC Connector Junction to NSE Junction will also remain inaccessible.
• Vehicles travelling on Avenue 3 Road can take a left turn at the WeWork building gap, then a right turn at the rear side of the WeWork building, proceed under the BKC Connector Bridge to MMRDA Ground and continue from NSE Junction to their desired destination.

WhatsApp
LinkedIn
Facebook
Twitter
Email

Subscribe Our Newsletter

Book a Demo

Please enable JavaScript in your browser to complete this form.
Are you using any Analysis tool or had used before ?
LinkedIn, Friends of Friend, etc.