As per reports, Enel Colombia is carrying out scheduled maintenance and improvement works on electricity supply networks across multiple localities in Bogotá on Wednesday (16 September), resulting in temporary power supply interruptions in the following areas:
• Power supply is scheduled to be interrupted in Barrio San Diego Bosa, Localidad de Bosa, across the area bounded by Carrera 77 to Carrera 79 and Calle 84 Sur to Calle 87 Sur, from 0730 hours local time (1230 hours UTC) until 1700 hours local time (2200 hours UTC) on Wednesday (16 September).
• In the Localidad de Chapinero, a power supply interruption is scheduled in Barrio San Isidro Rural, across the area bounded by Calle 101 to Calle 103 and Carrera 8 Este to Carrera 12 Este, from 0830 hours local time (1330 hours UTC) until 1730 hours local time (2230 hours UTC) on Wednesday (16 September).
• In the Localidad de Ciudad Bolívar, Barrio Madelena is expected to experience a power supply interruption across the area bounded by Calle 59 Sur to Calle 61 Sur and Carrera 63 to Carrera 65, from 0800 hours local time (1300 hours UTC) until 1800 hours local time (2300 hours UTC) on Wednesday (16 September).
• In the Localidad de Engativá, a power supply interruption is scheduled in Barrio Villas de Granada I, across the area bounded by Calle 5 to Calle 11 and Carrera 31 to Carrera 35, from 0830 hours local time (1330 hours UTC) until 1730 hours local time (2230 hours UTC) on Wednesday (16 September).
• In the Localidad de Puente Aranda, two separate interruptions are scheduled on Wednesday (16 September). Barrio Centro Industrial, across the area bounded by Calle 16 to Calle 18 and Carrera 59 to Carrera 61, is expected to be affected from 0800 hours local time (1300 hours UTC) until 1200 hours local time (1700 hours UTC). A second interruption is scheduled in Barrio Ortezal, across the area bounded by Calle 20 to Calle 22 and Carrera 38 to Carrera 40, from 1300 hours local time (1800 hours UTC) until 1730 hours local time (2230 hours UTC).
• In the Localidad de San Cristóbal, a power supply interruption is scheduled in Barrio Las Guacamayas I, across the area bounded by Carrera 0 to Carrera 2 and Calle 36 Sur to Calle 38 Sur, from 0800 hours local time (1300 hours UTC) until 1700 hours local time (2200 hours UTC) on Wednesday (16 September).
• In the Localidad de Suba, Barrio Sabana de Tibabuyes Norte is expected to experience a power supply interruption across the area bounded by Calle 144 to Calle 146 and Carrera 127 to Carrera 129, from 0745 hours local time (1245 hours UTC) until 1700 hours local time (2200 hours UTC) on Wednesday (16 September).
• In the Localidad de Usaquén, multiple barrios are expected to be affected by power supply interruptions from 0800 hours local time (1300 hours UTC) until 1700 hours local time (2200 hours UTC) on Wednesday (16 September). The affected areas include Barrio Acacias Usaquén, Barrio Molinos Norte, Barrio Rincón del Chico, Barrio San Patricio, Barrio Santa Ana Occidental, Barrio Santa Ana, and Barrio Usaquén, across various blocks between Calle 103 and Calle 146 and Carrera 2 Este to Carrera 22.
Categories: Critical Infrastructure - Power Supply
Share on WhatsApp