As per reports, National Highways department in Dartford, responsible for maintaining motorways and A-roads, warns of two closures causing moderate delays, with wait times anticipated between 10-30 minutes.
• Two closures already in place are expected to carry on through Thursday (28 March): A282, A282 northbound, Dartford Crossing West Tunnel.
• On A2, from closures are expected till 0600 hours local time on Saturday (30 March), with moderate delays (10-30 minutes): A2 both directions Bexleyheath to Pepperhill, carriageway closures for surface works scheduled.
• On M25 Anticlockwise, junction 3 to junction 2, Lane closures for electrical works are scheduled through 0800 hours on Saturday (30 March).
• On A2, from 2000 hours on Monday (25 March), to 0600 hours local time on Thursday (28 March), slight delays (under 10 minutes)expected : A2 eastbound, Bean, diversion and lane closures for construction works.