As per reports, the reopening of Calle 72 station and closure of Calle 76 station is announced on Caracas trunk line as part of the necessary activities to allow the continuation of the Metro viaduct from Saturday (22 August).
• The Calle 72 station is expected to be reopened as a permanent station on the Caracas Centro trunk line, and this time, the new station is expected to have three cars and two entrances, as well as a connection with nine trunk lines and 18 transport routes.
• TransMilenio is expected to close the Calle 76 station to facilitate the development of the infrastructure that is expected to transform this mobility corridor in Bogotá.
