As per reports, Air-e Intervenida, the electricity distribution company operating in Atlántico Department, Colombia, has scheduled planned electrical works in multiple municipalities of the department for Monday (24 August), necessitating the temporary suspension of electricity supply in the affected areas.
• In the corregimiento of Cascajal, in the rural zone of Sabanalarga, electrical works are scheduled from 0800 hours to 1700 hours local time (1300 hours to 2200 hours UTC) on Monday (24 August). The electricity supply will be suspended for the duration of the works across the rural and urban zones of the corregimiento of Cascajal and in sectors and farms adjacent to the Sabanalarga–Cascajal road.
• Vegetation trimming works are scheduled on the Campeche–Baranoa road from 0805 hours to 1600 hours local time (1305 hours to 2100 hours UTC) on Monday (24 August), with associated electricity supply interruptions in affected sectors during this period.
• In the barrio Los Robles in Ponedera, a low-voltage electricity pole installation is scheduled at the intersection of Calle 20A and Carrera 141 from 0900 hours to 1700 hours local time (1400 hours to 2200 hours UTC) on Monday (24 August), with associated supply interruptions in the immediate area.
• In the barrio La Risota in Puerto Colombia, electrical network upgrade works are scheduled on the Transversal 1 at Calle 7E from 0805 hours to 1754 hours local time (1305 hours to 2254 hours UTC) on Monday (24 August), with associated supply interruptions in the affected sector.