Intelligence Alert

Load-shedding schedule announced in Tshwane for Thursday (14 March)

Risk level: Low Country: South Africa

As per reports, South Africa’s power utility Eskom has announced an alternating pattern of Stage 02 and 03 load-shedding in Tshwane for Thursday (14 March).

• Stage 03 load shedding will be implemented from 0000 (local time) to 0630 hours (local time), following which Stage 02 load shedding will come into effect from 0600 hours (local time) until 1630 hours (local time) on Thursday (14 March). Thereafter, Stage 03 will be implemented until 0030 hours (local time).
• The load-shedding schedule varies across different wards within Tshwane. A comprehensive list detailing the instances of load shedding alongside their corresponding wards can be accessed via: https://x.com/CityTshwane/status/1767985389162106940?s=20

Share on WhatsApp
Related

More from South Africa

See why global leaders trust Datasurfr.

A walkthrough tailored to your industry and threat profile.