As per report, the Mass Rapid Transit Authority of Thailand (MRTA) has stated that traffic on parts of the road along the entire route of the Purple Line Project, Tao Poon – Rat Burana (Kanchanaphisek Ring Road) in Bangkok will remain restricted between 2200 hours to 0400 hours from 14 June to 15 July.
• Inbound traffic on three lanes on Suk Sawat Road, at the entrance to Bhumibol Bridge Road, covering a distance of approximately 200 meters, will remain closed for the lifting of the railway tracks onto the track structure.
• As a result, the inbound side will be impassable, and the road at Soi Suk Sawat 54 will be diverted instead, while the outbound side can be used on three lanes.