As per reports, Infrastructure Malta has announced the temporary overnight closure of Triq Mikiel Anton Vassalli in Msida from 2000 hours local time (1800 hours UTC) on Friday (05 June) to 0500 hours local time (0300 hours UTC) on Saturday (06 June).
Reportedly, the closure is required to help with the installation of boundary wall panels as part of ongoing work associated with the Msida Junction Project.
