As per reports, planned signal work on Highway 4 near Vallecito is expected to cause traffic delays on Friday (20 March).
• The work will take place between Vallecito Bypass Road and Parrotts Ferry Road, with one-way traffic control in place.
• Authorities indicated that motorists may experience delays of up to 10 minutes during the work period.
• The roadworks are scheduled to occur between 0700 hours local time and 1600 hours local time (1400 hours UTC to 2300 hours UTC).
• Additional drainage work is also planned on Highway 26, which may result in similar delays in nearby areas.
• Traffic flow will be managed through temporary signals and traffic control measures during the operation.
