Fremantle Traffic Bridge to close for an year starting Sunday (01 February)

Country: Australia Event Date: 01-Feb-2026 Risk Level: Low Date Time: 2025-12-03T10:18:52Z

Impact Level: Notification

Locations Affected: Fremantle Traffic Bridge, Fremantle WA 6160, Perth, Western Australia, Australia

Tracking Id: RINTP220267316

Description:

The bridge will be shut for an year starting Sunday (01 February) 2026, for demolition and replacement.

Authorities have cited the age of the bridge as the cause for demolition.

Background:

According to authorities, the bridge has been deteriorating for years, and despite extensive strengthening and maintenance works, needs complete replacement.

Impact:

Traffic congestion is expected in/around the area of construction, leading to significant delays for vehicles entering and exiting the Fremantle Bridge. Increased traffic can be anticipated on alternative routes throughout the duration of the closure.

Recommendations:

Advised to plan and travel ahead of time.

It is advised to use local government/public works department notices, traffic police advisories, or navigation apps for the real-time status of the construction and expected delays.

Sources:
https://www.abc.net.au/news/2025-12-03/fremantle-traffic-bridge-closing-date/106098860
https://www.perthnow.com.au/wa/perth/south/fremantle/fremantle-bridge-closure-town-of-east-fremantle-says-not-enough-done-to-prepare-calls-for-lower-speed-limit-c-20750718